Rhoton Road Reconstruction
Sector: Car parking • Location: Yelm, Washington, United States of America
Source: Dodge USA
Rhoton Road Reconstruction - approximately a mile in length, includes widening road to 10-foot lanes with curb and gutter. Adding sidewalk along the west side of Rhoton Road and an 8-foot wide shared-use path on the east side. The City of Yelm may be seeking a consultant to provide design services for reconstruction of one mile of Rhoton Road, widening road to 10-foot lanes with curbs and gutter.
- Status
- Prospective
- Sector
- Car parking, Commercial, Road, Government, Automotive
- Location
- Yelm, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rhoton Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rhoton Road Reconstruction - approximately a mile in length, includes widening road to 10-foot lanes with curb and gutter. Adding sidewalk along the west side of Rhoton Road and an 8-foot wide shared-use path on the east side. The City of Yelm may be seeking a consultant to provide design services for reconstruction of one mile of Rhoton Road, widening road to 10-foot lanes with curbs and gutter. Project may include adding a sidewalk along the west side of Rhoton Road, and an eight-foot wide ... |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Yelm |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Road, Government, Automotive |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
