Rhyolite Ridge Lithium-Boron Project
Sector: Mining • Location: Nevada, United States
Source: Daily Maverick
Sibanye-Stillwater has decided to withdraw from the Rhyolite Ridge Lithium-Boron Project in Nevada due to challenges posed by the endangered Tiehm's buckwheat plant, which has delayed environmental permitting and required redesigns of the mine plan. The project was initially planned as a joint venture with Ioneer, but updated technical reports led to the decision to not proceed.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Cancelled |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Sibanye-Stillwater has decided to withdraw from the Rhyolite Ridge Lithium-Boron Project in Nevada due to challenges posed by the endangered Tiehm's buckwheat plant, which has delayed environmental permitting and required redesigns of the mine plan. The project was initially planned as a joint venture with Ioneer, but updated technical reports led to the decision to not proceed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
