Rhyolite Ridge Lithium-Boron Project
Sector: Mining • Location: Nevada, United States
Source: The Northern Miner
Sibanye-Stillwater has scrapped its planned investment in the Rhyolite Ridge lithium-boron project in Nevada due to weak prices for lithium. The company was set to invest $490 million for a 50% stake in a joint venture with Ioneer, but after reviewing updated studies, it opted against further investment, stating the project did not meet its investment criteria.
- Status
- Failure
- Sector
- Mining
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- The Northern Miner
ConstructChat
Ask ConstructChat about Rhyolite Ridge Lithium-Boron Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Cancelled |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sibanye-Stillwater has scrapped its planned investment in the Rhyolite Ridge lithium-boron project in Nevada due to weak prices for lithium. The company was set to invest $490 million for a 50% stake in a joint venture with Ioneer, but after reviewing updated studies, it opted against further investment, stating the project did not meet its investment criteria. |
Original sector | Mining |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | The Northern Miner |
URL |
More Details
Record type | Project |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
