Ribeiradio and Ermida Dams
Sector: Bridge • Location: Portugal
Source: FCC Construction
The Ribeiradio and Ermida project consists of the accesses to the Ribeiradio Dam and the re-establishment of the EM 569 highway on the River Vouga near Aveiro, some fifty kilometres north of Coimbra in Portugal.The "Aproveitamento Hidroelectrico Ribeiradio–Ermida " is an EDP (Electricidad de Portugal) project consisting of the execution of two hydraulic jumps, with eight-kilometre spacing, the Rib
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Ribeiradio and Ermida project consists of the accesses to the Ribeiradio Dam and the re-establishment of the EM 569 highway on the River Vouga near Aveiro, some fifty kilometres north of Coimbra in Portugal.The "Aproveitamento Hidroelectrico Ribeiradio–Ermida " is an EDP (Electricidad de Portugal) project consisting of the execution of two hydraulic jumps, with eight-kilometre spacing, the Ribeiradio and Ermida Dams. The objective of this hydroelectric operation is essentially the generation of hydroelectric power, although it is also intended for flood abatement and water storage.The works are divided into three parts: The Ribeiradio and Ermida Dams and their accesses.The Ribeiradio Dam has a gravity profile with an arc-shaped wall of 240 meters in radius and has a height of 78 meters. It also includes the power station accesses (1.6 kilometres) and those to the Observation and Control building (POC).The Ermida dam has a height of 35 meters and is 175 meters in long. It includes the accesses to the power station and the right bank from the EM-569 highway.Accesses to the Ribeiradio Dam and the re-establishment of the EM 569 highway: The Ribeiradio Dam accesses are 1 kilometre long on the right bank and 1.2 kilometres on the left bank, with a mean slope of 10%.The re-establishment of the EM 569 highway on the right bank of the Ermida Dam is approximately 2.35 kilometres. It includes the construction of a bridge over the River Salgueira. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
