logo

Ribeiradio and Ermida Dams

Sector: Bridge • Location: Portugal

Source: FCC Construction

Project
Closed

The Ribeiradio and Ermida project consists of the accesses to the Ribeiradio Dam and the re-establishment of the EM 569 highway on the River Vouga near Aveiro, some fifty kilometres north of Coimbra in Portugal.The "Aproveitamento Hidroelectrico Ribeiradio–Ermida " is an EDP (Electricidad de Portugal) project consisting of the execution of two hydraulic jumps, with eight-kilometre spacing, the Rib

Project Information FAQ

Project Information

3 Q
The project “Ribeiradio and Ermida Dams” is an infrastructure initiative in the Bridge sector, located in Portugal. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Ribeiradio and Ermida project consists of the accesses to the Ribeiradio Dam and the re-establishment of the EM 569 highway on the River Vouga near Aveiro, some fifty kilometres north of Coimbra in Portugal.The "Aproveitamento Hidroelectrico Ribeiradio–Ermida " is an EDP (Electricidad de Portugal) project consisting of the execution of two hydraulic jumps, with eight-kilometre spacing, the Ribeiradio and Ermida Dams. The objective of this hydroelectric operation is essentially the generation of hydroelectric power, although it is also intended for flood abatement and water storage.The works are divided into three parts: The Ribeiradio and Ermida Dams and their accesses.The Ribeiradio Dam has a gravity profile with an arc-shaped wall of 240 meters in radius and has a height of 78 meters. It also includes the power station accesses (1.6 kilometres) and those to the Observation and Control building (POC).The Ermida dam has a height of 35 meters and is 175 meters in long. It includes the accesses to the power station and the right bank from the EM-569 highway.Accesses to the Ribeiradio Dam and the re-establishment of the EM 569 highway: The Ribeiradio Dam accesses are 1 kilometre long on the right bank and 1.2 kilometres on the left bank, with a mean slope of 10%.The re-establishment of the EM 569 highway on the right bank of the Ermida Dam is approximately 2.35 kilometres. It includes the construction of a bridge over the River Salgueira.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data