Rich Road Solar (240 MW) + Storage (20 MW)
Sector: Commercial • Location: Canton, New York, United States of America
Source: Dodge USA
240 MW ground-mounted solar farm and 20 MW battery storage across 1,700 acres, enough power for 61,400 homes annually. To include a 34.5 kV to 345 kV collection substation with control building, and an Operations and Maintenance building. To interconnect to the existing NYPA Moses - Adirondack transmission line.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planning Schematics |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 240 MW ground-mounted solar farm and 20 MW battery storage across 1,700 acres, enough power for 61,400 homes annually. To include a 34.5 kV to 345 kV collection substation with control building, and an Operations and Maintenance building. To interconnect to the existing NYPA Moses - Adirondack transmission line. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
