Richfield Sewer System Improvement REBID
Sector: Water Supply and Storage • Location: Albemarle, North Carolina, United States of America
Source: Dodge USA
The Project consists of the following major items: 1. Make Repairs to 9 sewer effluent pump stations including hatch replacements, pump rail and piping replacements, bypass connection, spare pumps, pump replacement and electrical improvements as noted on the drawings. 2. Installation of permanent generator at PS 1 3. Replacement of top plugs in 215 system septic tanks 4. SCADA Installation
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Rail, Government, Commercial
- Location
- Albemarle, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Richfield Sewer System Improvement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the following major items: 1. Make Repairs to 9 sewer effluent pump stations including hatch replacements, pump rail and piping replacements, bypass connection, spare pumps, pump replacement and electrical improvements as noted on the drawings. 2. Installation of permanent generator at PS 1 3. Replacement of top plugs in 215 system septic tanks 4. SCADA Installation |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Albemarle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Rail, Government, Commercial |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
