Richland One Early Learning Center Construction Project
Sector: Road • Location: Columbia, South Carolina, United States
Source: WIS News 10
A construction project for an early learning center by Richland School District One that was cleared and had retention ponds dug but was later abandoned and demolished due to flooding issues and lack of proper permits. The project caused routine flooding in a nearby 51-home neighborhood for nearly two years.
- Status
- Failure
- Sector
- Road, Education, Residential, Government
- Location
- Columbia, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- WIS News 10
ConstructChat
Ask ConstructChat about Richland One Early Learning Center Construction Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | demolished |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A construction project for an early learning center by Richland School District One that was cleared and had retention ponds dug but was later abandoned and demolished due to flooding issues and lack of proper permits. The project caused routine flooding in a nearby 51-home neighborhood for nearly two years. |
Original sector | Education |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Columbia |
Source
Source | WIS News 10 |
URL |
More Details
Record type | Project |
Sector | Road, Education, Residential, Government |
Article published date | 2025-11-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
