Pre-Construction

The project consists of two components. Reconstructing the pump station will quadruple its pumping capacity from 1.2 m3/s to a minimum of 4.8 m3/s. Raising approximately 220 m of dike by 1.2 m to an elevation of 4.7 m will connect two already raised sections, resulting in over 1,200 meters of dike built to year 2100 flood design levels. Completing this project will enhance the City’s level of floo

Project Information FAQ

Project Information

5 Q
The project “Richmond - No. 3 Road South Drainage Pump Station and Dike Upgrade” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of two components. Reconstructing the pump station will quadruple its pumping capacity from 1.2 m3/s to a minimum of 4.8 m3/s. Raising approximately 220 m of dike by 1.2 m to an elevation of 4.7 m will connect two already raised sections, resulting in over 1,200 meters of dike built to year 2100 flood design levels. Completing this project will enhance the City’s level of flood protection and ensure that Richmond is better prepared for climate change induced sea level rise and increases to rainfall intensities while protecting approx. 29,500 residents, 47 businesses and 8 square kms of agricultural land. This project serves as a significant component of the City’s Flood Protection Management Strategy, protecting approx. 225,000 residents, 13,000 businesses and 52 square kms of agricultural land. As part of design, the engineering consultant will perform geotechnical investigations, Environmental Impact Assessment, Archaeological Overview Assessment and design the pump station and dike upgrade following provincial guidelines and provide all plans necessary. The new pump station will require an upsized wet well, floodbox, two inlet culverts, two discharge culverts, a new discharge headwall, and a new above-ground utility building housing a new motor control centre and permanent back-up generator. The scope includes installation of variable frequency drive pumps, station controls and alarms, and actuated flood control flap gates to provide irrigation for agriculture purposes. The dike upgrade will require stripping of existing materials, placing and compacting new dike fill material, constructing a drainage layer on land side of the dike and placing new rip rap on the water side. Once the new elevation is achieved, the top of the dike will be reinstated as Dyke Road with parking space, native plants and a multi-use trail. Access to the No. 3 Road Sports Fishing Pier at the west end of the project will be accommodated in the raised dike design.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data