Richmond Plant Split Loop Simplex Panel Upgrade
One of 10,000+ projects Taiyo tracks in Pennsylvania.
Source: Dodge USA
Split Loop Project - Upgrade Simplex Panel at Expander Plant and River Water Pump Building At Richmond Plant .The Contractor shall furnish all labor, transportation, supervision, tools, permitting, testing, equipment and materials necessary for and incidental to the construction. All Work shall be in accordance with this specification and the construction drawings.
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Waste Processing and Treatment
- Location
- Philadelphia, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Richmond Plant Split Loop Simplex Panel Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Split Loop Project - Upgrade Simplex Panel at Expander Plant and River Water Pump Building At Richmond Plant .The Contractor shall furnish all labor, transportation, supervision, tools, permitting, testing, equipment and materials necessary for and incidental to the construction. All Work shall be in accordance with this specification and the construction drawings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Philadelphia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
