RIDC New Kensington Waterline
Sector: Water Supply and Storage • Location: New Kensington, Pennsylvania, United States of America
Source: Dodge
This project involves upgrades to existing waterline and vaults in and along streets located in the New Kensington Advanced Manufacturing Park, including but not limited to, the replacement of existing 6 and 8 waterline; service lateral installations; fittings with thrust blocking; temporary waterline (as needed); placement of a new water meter vault; connections to existing water mains; bituminou
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Power Transmission, Manufacturing (Industrial), Car parking, Automotive, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- New Kensington, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RIDC New Kensington Waterline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves upgrades to existing waterline and vaults in and along streets located in the New Kensington Advanced Manufacturing Park, including but not limited to, the replacement of existing 6 and 8 waterline; service lateral installations; fittings with thrust blocking; temporary waterline (as needed); placement of a new water meter vault; connections to existing water mains; bituminous trench restoration; traffic control; notifications; utility support and protection; site prepar... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | New Kensington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Power Transmission, Manufacturing (Industrial), Car parking, Automotive, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
