Rider Iron & Steel Ghana Limited
Sector: Waste Processing and Treatment • Location: Ghana
Source: International Finance Corporation (IFC)
Rider Steel Ghana Limited (RSG), a legally registered public liability company in Ghana, operates a direct rolling steel factory in Tema, Accra with 80,000 metric tons per annum (“MTPA”) name plate steel melting capacity. RSG’s operation is now stabilizing and profitable, and the management plans to expand steel production in Kumasi, Ghana, which is about 250 kilometers from Accra, through Rider I
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Rider Steel Ghana Limited (RSG), a legally registered public liability company in Ghana, operates a direct rolling steel factory in Tema, Accra with 80,000 metric tons per annum (“MTPA”) name plate steel melting capacity. RSG’s operation is now stabilizing and profitable, and the management plans to expand steel production in Kumasi, Ghana, which is about 250 kilometers from Accra, through Rider Iron and Steel Ghana Limited (“Rider Steel Kumasi”, “RSK” or the “company”), is legally registered entity in Ghana. The expansion will involve the construction and operation of a steel manufacturing Plant in Kumasi comprising up to six 20 metric tons (“MT”) furnaces, with a total production capacity of 240,000 MT/year, by RSK (the “Project”). The Project will initially install three 20MT furnaces with an effective capacity of 120,000 MT/year, and subsequently expanding to six 20MT furnaces with an effective capacity of 240,000t/y. The site will be served by grid electricity and piped water, both to be built by government authorities but recovered from RSK (“associated facilities”). The proposed 5km water supply line will be laid on existing road reserves and connected to the existing Ghana Water Company (GWC) distribution network. The 33kV power line will be laid within an existing GridCo Right of Way (RoW) and a new RoW of 10m wide and 800m long on stool land. RSK has invited IFC to support the planned expansion. IFC now proposes to provide up to US$12.0million A Loan for the project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
