logo

Ridge at Northlake Utility Improvements Ph - 5

Sector: Water Supply and Storage • Location: Carrollton, Texas, United States of America

Source: Dodge USA

Project
Closed

Project scope shall include the Utility Improvements, approximately 7,628 LF of 12 and 8 water, 7,820 LF of 8 sanitary sewer, and 4,286 LF of 4 x 3 RCB through 18 RCP storm sewer per NCTCOG and Owner s Geotechnical Engineer s specifications to serve 123 lots on approximately 37 acres. The project is located West of I-35 and south of Robson Ranch Road, in the Town of Northlake, Denton County, Texas

Status
Closed
Sector
Water Supply and Storage, Road, Commercial, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government
Location
Carrollton, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Ridge at Northlake Utility Improvements Ph - 5

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ridge at Northlake Utility Improvements Ph - 5” is an infrastructure initiative in the Water Supply and Storage sector, located in Carrollton, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project scope shall include the Utility Improvements, approximately 7,628 LF of 12 and 8 water, 7,820 LF of 8 sanitary sewer, and 4,286 LF of 4 x 3 RCB through 18 RCP storm sewer per NCTCOG and Owner s Geotechnical Engineer s specifications to serve 123 lots on approximately 37 acres. The project is located West of I-35 and south of Robson Ranch Road, in the Town of Northlake, Denton County, Texas.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Carrollton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Commercial, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project