Ridge Bulk Supply Point Expansion and Replacement
Sector: Power Generation (CCGT) • Location: Kumasi, Ashanti, Ghana
Source: MyJoyOnline
Assessment and potential replacement and expansion of the 33 kV GIS panels at Ridge Bulk Supply Point in readiness to receive increased capacity from GRIDCo’s 145 MVA transformers to improve operational efficiency and power reliability.
- Status
- Under Construction
- Sector
- Power Generation (CCGT)
- Location
- Kumasi, Ashanti, Ghana
- Updated
- 22 Jul 2026
- Source
- MyJoyOnline
ConstructChat
Ask ConstructChat about Ridge Bulk Supply Point Expansion and Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned/under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Assessment and potential replacement and expansion of the 33 kV GIS panels at Ridge Bulk Supply Point in readiness to receive increased capacity from GRIDCo’s 145 MVA transformers to improve operational efficiency and power reliability. |
Original sector | Energy |
Location
Country | Ghana |
State | Ashanti |
City | Kumasi |
Source
Source | MyJoyOnline |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
