Ridge Rd Roadway construction
Sector: Waste Processing and Treatment • Location: Greenville, South Carolina, United States of America
Source: Dodge
Roadway construction improvements on Ridge Rd & Isbell Ln. and drainage improvements on Roper Mtn. Rd. Major items of work include: 361.86 tons of PG64-22, 12,296 SY's of Milling Asphalt Pavement, 5995 tons of Asphalt Pavement, 3,217 linear feet of 18" Pipe, 1,328 linear feet of 36" Pipe, Catch Basins, 5,384 linear feet of Concrete Curb & Gutter, 1,400 SY's of Concrete Sidewalk, 320 SY's of Concre
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Car parking, Automotive, Commercial, Cement, Government, Manufacturing (Industrial)
- Location
- Greenville, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ridge Rd Roadway construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Roadway construction improvements on Ridge Rd & Isbell Ln. and drainage improvements on Roper Mtn. Rd. Major items of work include: 361.86 tons of PG64-22, 12,296 SY's of Milling Asphalt Pavement, 5995 tons of Asphalt Pavement, 3,217 linear feet of 18" Pipe, 1,328 linear feet of 36" Pipe, Catch Basins, 5,384 linear feet of Concrete Curb & Gutter, 1,400 SY's of Concrete Sidewalk, 320 SY's of Concrete Driveway 6", 370 SY's of Pedestrian Ramp Construction, & other miscellaneous items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Greenville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Car parking, Automotive, Commercial, Cement, Government, Manufacturing (Industrial) |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
