logo
ProjectPlanning Schematics

RI/DOT: Bridge Group 23C Bridge Replacement

Sector: Water Supply and Storage • Location: Arizona, United States of America

Source: Dodge

PROJECT TITLE: ON CALL SCOPING/PRELIMINARY ENGINEERING FOR BRIDGE GROUP 23C, OLD WARWICK AVENUE & HARDIG BROOK BRIDGE, WARWICK :::: PROJECT DESCRIPTION: ON CALL SCOPING/PRELIMINARY ENGINEERING FOR BRIDGE GROUP 23C, OLD WARWICK AVENUE & HARDIG BROOK BRIDGE NO. 079, WARWICK - PROJECT MANAGER - JOEL PRYOR This project includes the total replacement of the Hardig Brook Bridge, Airport Road Culvert, an

Status
Prospective
Sector
Water Supply and Storage, Airport, Commercial, Bridge, Waste Processing and Treatment, Road
Location
Arizona, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RI/DOT: Bridge Group 23C Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RI/DOT: Bridge Group 23C Bridge Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Arizona, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

PROJECT TITLE: ON CALL SCOPING/PRELIMINARY ENGINEERING FOR BRIDGE GROUP 23C, OLD WARWICK AVENUE & HARDIG BROOK BRIDGE, WARWICK :::: PROJECT DESCRIPTION: ON CALL SCOPING/PRELIMINARY ENGINEERING FOR BRIDGE GROUP 23C, OLD WARWICK AVENUE & HARDIG BROOK BRIDGE NO. 079, WARWICK - PROJECT MANAGER - JOEL PRYOR This project includes the total replacement of the Hardig Brook Bridge, Airport Road Culvert, and the removal of the existing structures of Old Warwick Ave bridge in Warwick. The structure will...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Airport, Commercial, Bridge, Waste Processing and Treatment, Road

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project