RI/DOT: Paver Placed Elastomeric Surface Treatment C-1
Sector: Water Supply and Storage • Location: Providence, Rhode Island, United States of America
Source: Dodge USA
2606N - The work encompassed in this contract shall include, but not be limited to, performing all operations and furnishing all materials, labor and equipment necessary for sweeping, cleaning, micromilling, surface preparation, shimming and leveling, application of paver placed elastomeric surface treatment (PPEST) and other specified bituminous hot mix asphalt (HMA) across existing bituminous pa
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 2606N - The work encompassed in this contract shall include, but not be limited to, performing all operations and furnishing all materials, labor and equipment necessary for sweeping, cleaning, micromilling, surface preparation, shimming and leveling, application of paver placed elastomeric surface treatment (PPEST) and other specified bituminous hot mix asphalt (HMA) across existing bituminous pavements within the specified longitudinal and transverse limits. Also included in the work shall ... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
