RI/DOT: Route 4 Pavement Improvements
Sector: Water Supply and Storage • Location: North Kingstown, Rhode Island, United States of America
Source: Dodge USA
Pavement Improvements - Route 4 from the Lafayette Railroad Bridge to approximately 0.8 miles north of the Route 403 Interchange within the towns of North Kingstown and East Greenwich. The project extends over approximately 5.1 miles and includes the following work: micromilling pavement, cleaning and sweeping pavement, placing tack coat, installing a friction course pavement overlay, repairing dr
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Rail, Road, Waste Processing and Treatment, Steel, Mass Transit, Metal, Commercial
- Location
- North Kingstown, Rhode Island, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RI/DOT: Route 4 Pavement Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Pavement Improvements - Route 4 from the Lafayette Railroad Bridge to approximately 0.8 miles north of the Route 403 Interchange within the towns of North Kingstown and East Greenwich. The project extends over approximately 5.1 miles and includes the following work: micromilling pavement, cleaning and sweeping pavement, placing tack coat, installing a friction course pavement overlay, repairing drainage structures, constructing Stormwater Treatment Units (STUs), replacing steel-beam guardrail... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Rhode Island |
City | North Kingstown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Rail, Road, Waste Processing and Treatment, Steel, Mass Transit, Metal, Commercial |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
