RI/DOT: Sidewalk Improvements
Sector: Water Supply and Storage • Location: Warwick, Rhode Island, United States of America
Source: Dodge USA
2604X - This project consists of curbing, sidewalk, and wheelchair ramp installation, micro milling and overlay, and installation of pedestrian signal equipment at existing traffic signal systems along Route 117 (Centerville Road); curbing, sidewalk, and wheelchair ramp installation and micro milling and overlay along West Shore Road; and stormwater treatment unit (STU) installation on airport lan
- Status
- Closed
- Sector
- Water Supply and Storage, Airport, Car parking, Road, Waste Processing and Treatment, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Warwick, Rhode Island, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RI/DOT: Sidewalk Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2604X - This project consists of curbing, sidewalk, and wheelchair ramp installation, micro milling and overlay, and installation of pedestrian signal equipment at existing traffic signal systems along Route 117 (Centerville Road); curbing, sidewalk, and wheelchair ramp installation and micro milling and overlay along West Shore Road; and stormwater treatment unit (STU) installation on airport land away from public access along Airport Road in Warwick, RI. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Rhode Island |
City | Warwick |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Airport, Car parking, Road, Waste Processing and Treatment, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
