logo

Rift Valley Energy Renewable portfolio expansion

Sector: Wind • Location: Tanzania

Source: World Bank Group

Project
Active

The project involves the expansion and construction of new renewable energy infrastructure with a total capacity of 7.6MW. This includes new 2.4MW onshore wind and 5.2MW hydropower installations aimed at increasing the availability of renewable energy. It is located in the Southern Highlands of Tanzania, near the villages of Malamba and Bunyakikosi in the Rungwe District, approximately 15 km from

Project Information FAQ

Project Information

4 Q
The project “Rift Valley Energy Renewable portfolio expansion” is an infrastructure initiative in the Wind sector, located in Tanzania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the expansion and construction of new renewable energy infrastructure with a total capacity of 7.6MW. This includes new 2.4MW onshore wind and 5.2MW hydropower installations aimed at increasing the availability of renewable energy. It is located in the Southern Highlands of Tanzania, near the villages of Malamba and Bunyakikosi in the Rungwe District, approximately 15 km from Tukuyu Township. The project is expected to provide energy to approximately 170,000 people annually and connect 4,000 businesses and households to the grid for the first time. The electricity generated by the new installations will primarily be sold to Tanzania's national utility, TANESCO, through Standardized Power Purchase Agreements (SPPAs). The main off-taker of the produced electricity will be TANESCO. The total funding for the project is $15 million, provided via a loan by British International Investment (BII). Sponsor is Rift Valley Energy, which is owned and managed by Meridiam. The financial closure for the project was achieved on June 18, 2024. https://africa-energy-portal.org/news/tanzania-rift-valley-energy-connects-its-24-mw-wind-farm-mwenga ; https://www.riftvalleyenergy.com/projects/suma-hydro-power-and-rural-electrification/ ; https://www.vccircle.com/meridiamowned-rift-valley-energy-secures-15-mn-commitment ; https://www.meridiam.com/news/bii-signs-agreement-with-meridiam-to-provide-15m-to-rift-valley-energy-to-expand-access-to-sustainable-energy-in-tanzania/ https://africa-energy-portal.org/news/tanzania-rift-valley-energy-connects-its-24-mw-wind-farm-mwenga ; https://www.riftvalleyenergy.com/projects/suma-hydro-power-and-rural-electrification/ ; https://www.vccircle.com/meridiamowned-rift-valley-energy-secures-15-mn-commitment ; https://www.meridiam.com/news/bii-signs-agreement-with-meridiam-to-provide-15m-to-rift-valley-energy-to-expand-access-to-sustainable-energy-in-tanzania/

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data