logo
ProjectClosed

Riga District Heating Project

Closed · Latvia

Source: World Bank Group

The Riga District Heating (DH) Rehabilitation Project will optimize the operational performance of the DH system, increase the efficiency of heat supply, and improve reliability of service delivery. Energy conservation will be enhanced, and environmental conditions will improve, through transmission, and distribution of network rehabilitation, substation modernization, and new technologies. Pricin

Status
Closed
Sector
Commercial, Government
Location
Latvia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Riga District Heating Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Riga District Heating Project” is an infrastructure initiative in the Commercial sector, located in Latvia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Riga District Heating (DH) Rehabilitation Project will optimize the operational performance of the DH system, increase the efficiency of heat supply, and improve reliability of service delivery. Energy conservation will be enhanced, and environmental conditions will improve, through transmission, and distribution of network rehabilitation, substation modernization, and new technologies. Pricing policies, and commercial practices will allow the competitive development of Rigas Siltums, to achieve eventual privatization. The two main components will: 1) supply, and install automated consumer substations to allow the introduction of variable flow, thus facilitate the dispatching of heat load from the current, underutilized plant, and in turn facilitate energy savings for consumers. Pipe sections will be replaced as needed to abate leaks, while construction of a pipeline interconnection, and installation of pumping stations will facilitate the right, and left bank networks heat demand; 2) include institutional support through consulting services in procurement, project financial reporting, and disbursement. In addition consulting services will be provided to assist in the evaluation for an applicable two-tier heat tariff, emphasizing its suitability through public awareness campaigns. Advisory services will improve municipal social assistance programs, and an evaluation of ownership options will be developed.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Latvia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project