logo
ProjectActive

Rincon Lithium

Active · Argentina

Source: International Finance Corporation (IFC)

The Project entails developing, constructing, and operating the greenfield Salar del Rincon battery-grade lithium project (the “Project” or “Rincon”). Rincon is expected to produce ~up to 53 thousand tonnes per year (ktpa) of battery-grade Lithium Carbonate Equivalent (LCE) over its 40-year mine. The Project will include wellfields and a brine distribution system, a spent brine disposal facility,

Status
Prospective
Sector
Energy Storage, Power Generation (CCGT), Metal, Water Supply and Storage, Government, Commercial
Location
Argentina
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Rincon Lithium

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rincon Lithium” is an infrastructure initiative in the Energy Storage sector, located in Argentina. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project entails developing, constructing, and operating the greenfield Salar del Rincon battery-grade lithium project (the “Project” or “Rincon”). Rincon is expected to produce ~up to 53 thousand tonnes per year (ktpa) of battery-grade Lithium Carbonate Equivalent (LCE) over its 40-year mine. The Project will include wellfields and a brine distribution system, a spent brine disposal facility, a processing complex, filtered waste storage facilities, power transmission lines (two 23 km, 33 kV lines), and ancillary infrastructure.

Original sector

B-BG - All Other Metal (Including Tin, Tantalum, Tungsten, etc.)

Budget

Location

Country

Argentina

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Metal, Water Supply and Storage, Government, Commercial

Article published date

2026-06-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project