logo

Ring Expressway Project in Rongchang District

Sector: Mass Transit • Location: China

Source: World Bank Group

Project
Active

The route of this project starts from Qingjiang Town, connecting Nanyulu Expressway and establishing Qingjiang Hub Interchange, passing through the open service area of ??Ancient Foshan on the south side of Qingsheng Town, passing through Tangjiawan, crossing the Guangshuang Railway, passing through the north side of Shuanghe Street Shuanghe Interchange, through the south side of Zhisheng Town, se

Project Information FAQ

Project Information

4 Q
The project “Ring Expressway Project in Rongchang District” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The route of this project starts from Qingjiang Town, connecting Nanyulu Expressway and establishing Qingjiang Hub Interchange, passing through the open service area of ??Ancient Foshan on the south side of Qingsheng Town, passing through Tangjiawan, crossing the Guangshuang Railway, passing through the north side of Shuanghe Street Shuanghe Interchange, through the south side of Zhisheng Town, set up a direct rise interchange, stop at the west side of Fenggao Street and connect to G85 Chengyu Expressway set up Fenggao Hub Interchange, a total length of 23.61 kilometers, 0 tunnels, bridges accounted for 12.45% It adopts the design speed of 100 km/h, the roadbed width of 26 meters, and the two-way 4-lane expressway standard construction. Total investment stands at $ 434.63 million. Type of concession is BOT with a period of 33 years. Financial close took place on March 18, 2021. https://www.cpppc.org:8082/inforpublic/homepage.html#/projectDetail/786fd064953245b487b382c535a1408a

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data