Ringgold Road Sidewalks & Crosswalks
Sector: Car parking • Location: Clarksville, Tennessee, United States of America
Source: Dodge USA
The work to be performed (Work) includes the construction of approximately 2550+/- linear feet of sidewalk, with curb and gutter, storm drainage, and crosswalks. The work includes traffic control along with all necessary materials, labor and equipment to complete the Work as set out more fully in the Specifications. The time for completion of the work is 270 days.
- Status
- Closed
- Sector
- Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial
- Location
- Clarksville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ringgold Road Sidewalks & Crosswalks
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed (Work) includes the construction of approximately 2550+/- linear feet of sidewalk, with curb and gutter, storm drainage, and crosswalks. The work includes traffic control along with all necessary materials, labor and equipment to complete the Work as set out more fully in the Specifications. The time for completion of the work is 270 days. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Clarksville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
