logo

Rio do Fogo Wind Farm

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

In February 2005, the state controlled utility Electrobras signed a 20 year power purchase agreement (PPA) with the Spanish firm Iberdrola SA for energy from a new 49 MW wind farm titled Rio do Fogo in Rio Grande do Norte state. The new wind farm had an estimated cost of US $93 million and was developed by Enerbrasil, Iberdrola SA’s subsidiary. The project was developed under the federal initiat

Status
Prospective
Sector
Manufacturing (Industrial), Wind, Power Generation (CCGT), Raw Materials, Power Transmission, Commercial, Warehouse, Government
Location
Rio Grande Do Norte, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Rio do Fogo Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Rio do Fogo Wind Farm” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Rio Grande Do Norte, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In February 2005, the state controlled utility Electrobras signed a 20 year power purchase agreement (PPA) with the Spanish firm Iberdrola SA for energy from a new 49 MW wind farm titled Rio do Fogo in Rio Grande do Norte state. The new wind farm had an estimated cost of US $93 million and was developed by Enerbrasil, Iberdrola SA’s subsidiary. The project was developed under the federal initiative of ProInfra funding of US $5.5 billion through BNDES, the Brazilian development bank. ProInfra was created by the Brazilian ministry of mines and energy to diversify Brazilian energy supply and expand its capacity by 3.3 thousand megawatts. The project reached financial closure in April 2006 upon the granting of a direct loan from BNDES for US $31.5 million (R $68 million) and a second tranche underwritten by Banco ABN AMRO Real for an additional US $31.5 million. 65% of the project was financed through debt and the remaining 35% was financed through equity. Iberdrola SA owned the project through its subsidiary Enerbrasil. As of 2006, the project had completed its first phase of construction. Construction of the wind farm was completed by Wobben Windpower Ltda, the local Brazilian manufacturing facility of Enercon GmbH of Germany. It became operational in 2007.

Original sector

Energy

Budget

Location

Country

Brazil

State

Rio Grande Do Norte

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Wind, Power Generation (CCGT), Raw Materials, Power Transmission, Commercial, Warehouse, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project