Rio do Fogo Wind Farm
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
In February 2005, the state controlled utility Electrobras signed a 20 year power purchase agreement (PPA) with the Spanish firm Iberdrola SA for energy from a new 49 MW wind farm titled Rio do Fogo in Rio Grande do Norte state. The new wind farm had an estimated cost of US $93 million and was developed by Enerbrasil, Iberdrola SA’s subsidiary. The project was developed under the federal initiat
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Wind, Power Generation (CCGT), Raw Materials, Power Transmission, Commercial, Warehouse, Government
- Location
- Rio Grande Do Norte, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Rio do Fogo Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In February 2005, the state controlled utility Electrobras signed a 20 year power purchase agreement (PPA) with the Spanish firm Iberdrola SA for energy from a new 49 MW wind farm titled Rio do Fogo in Rio Grande do Norte state. The new wind farm had an estimated cost of US $93 million and was developed by Enerbrasil, Iberdrola SA’s subsidiary. The project was developed under the federal initiative of ProInfra funding of US $5.5 billion through BNDES, the Brazilian development bank. ProInfra was created by the Brazilian ministry of mines and energy to diversify Brazilian energy supply and expand its capacity by 3.3 thousand megawatts. The project reached financial closure in April 2006 upon the granting of a direct loan from BNDES for US $31.5 million (R $68 million) and a second tranche underwritten by Banco ABN AMRO Real for an additional US $31.5 million. 65% of the project was financed through debt and the remaining 35% was financed through equity. Iberdrola SA owned the project through its subsidiary Enerbrasil. As of 2006, the project had completed its first phase of construction. Construction of the wind farm was completed by Wobben Windpower Ltda, the local Brazilian manufacturing facility of Enercon GmbH of Germany. It became operational in 2007. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Rio Grande Do Norte |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Wind, Power Generation (CCGT), Raw Materials, Power Transmission, Commercial, Warehouse, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Potiguar Sul Transmissao de Energia
- ERB Candeias Thermal Power Plant
