logo

Rio Grande LNG Train 5 Primary Liquefaction Equipment Supply

One of 10,000+ projects Taiyo tracks in Texas.

Source: Stock Titan

Project
Awarded

Baker Hughes was awarded by Bechtel to supply primary liquefaction equipment for Train 5 of NextDecade's Rio Grande LNG Facility in Brownsville, Texas. The scope includes two Frame 7 gas turbines and six centrifugal compressors, replicating proven technology from previous trains, enabling approximately 6 MTPA of additional LNG production capacity. This order is part of a framework agreement coveri

Status
Closed
Sector
Rail, LNG
Location
Brownsville, Texas, United States of America
Updated
22 Jul 2026
Source
Stock Titan

ConstructChat

Ask ConstructChat about Rio Grande LNG Train 5 Primary Liquefaction Equipment Supply

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rio Grande LNG Train 5 Primary Liquefaction Equipment Supply” is an infrastructure initiative in the Rail sector, located in Brownsville, Texas, United States. Taiyo aggregates data on it from Stock Titan.

Participants

Company

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Baker Hughes was awarded by Bechtel to supply primary liquefaction equipment for Train 5 of NextDecade's Rio Grande LNG Facility in Brownsville, Texas. The scope includes two Frame 7 gas turbines and six centrifugal compressors, replicating proven technology from previous trains, enabling approximately 6 MTPA of additional LNG production capacity. This order is part of a framework agreement covering Trains 4 through 8. Additionally, Baker Hughes will deploy Cordant™ Asset Health digital solutions for Trains 1 to 3 for equipment monitoring and diagnostics.

Original sector

Energy

Location

Country

United States of America (USA)

State

Texas

City

Brownsville

Source

Source

Stock Titan

URL

More Details

Record type

Project

Sector

Rail, LNG

Article published date

2025-11-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project