logo

Rio Lago Solar Farm

Sector: Power Generation (CCGT) • Location: Bandera, Texas, United States of America

Source: Dodge USA

Project
Start

proposed 120 megawatt solar farm northwest of Bandera along 3240 - project will have a 50 foot minimum setback from property line to fence - Solar panels will be surrounded by a wildlife fence not chain-link with barbed wire

Status
Under Construction
Sector
Power Generation (CCGT), Raw Materials, Solar, Commercial
Location
Bandera, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Rio Lago Solar Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rio Lago Solar Farm” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bandera, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

proposed 120 megawatt solar farm northwest of Bandera along 3240 - project will have a 50 foot minimum setback from property line to fence - Solar panels will be surrounded by a wildlife fence not chain-link with barbed wire

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Bandera

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Raw Materials, Solar, Commercial

Article published date

2023-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project