El Salvador is the smallest and most densely populated of the Cen American republics. Its industrial development has been seriously ret a shortage of electric power and the necessity for importing fuel. Po not a political question in El Salvador, as all factions seem to be un the purpose to develop the latent hydro-electric power of the Lempa Ri remove the impediment to national progress and secur

Project Information FAQ

Project Information

5 Q
The project “RIO LEMPA HYDROELECT” is an infrastructure initiative in the Water Supply and Storage sector, located in El Salvador. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

El Salvador is the smallest and most densely populated of the Cen American republics. Its industrial development has been seriously ret a shortage of electric power and the necessity for importing fuel. Po not a political question in El Salvador, as all factions seem to be un the purpose to develop the latent hydro-electric power of the Lempa Ri remove the impediment to national progress and security. A plan has b submitted by the Harza Engineering Company, of Chicago, for the ultima development of 75,000 kilowatts of generating capacity at the Chorrera Guayabo site and transmission of the power to all load centers of the The reservoir will provide 128,000 acre feet of effective storage. Th report recommends the initial installation of only 30,000 KW and deliv the power through two separate 115,00 volt transmission lines to the S Salvador load center for wholesale disposal to the various utility sys through their existing and proposed interconnections. According to th report, the power market is expected to absorb the entire output of th Guayabo installation, 182,000,000 kilowatt hours per annum, by the tim plant has been in operation five years.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data