logo
ProjectClosed

RIO LEMPA HYDROELECT

Sector: Water Supply and Storage • Location: El Salvador

Source: World Bank Group

El Salvador is the smallest and most densely populated of the Cen American republics. Its industrial development has been seriously ret a shortage of electric power and the necessity for importing fuel. Po not a political question in El Salvador, as all factions seem to be un the purpose to develop the latent hydro-electric power of the Lempa Ri remove the impediment to national progress and secur

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Manufacturing (Industrial), Steel, Metal, Power Generation (CCGT), Hydro, Government
Location
El Salvador
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about RIO LEMPA HYDROELECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “RIO LEMPA HYDROELECT” is an infrastructure initiative in the Water Supply and Storage sector, located in El Salvador. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

El Salvador is the smallest and most densely populated of the Cen American republics. Its industrial development has been seriously ret a shortage of electric power and the necessity for importing fuel. Po not a political question in El Salvador, as all factions seem to be un the purpose to develop the latent hydro-electric power of the Lempa Ri remove the impediment to national progress and security. A plan has b submitted by the Harza Engineering Company, of Chicago, for the ultima development of 75,000 kilowatts of generating capacity at the Chorrera Guayabo site and transmission of the power to all load centers of the The reservoir will provide 128,000 acre feet of effective storage. Th report recommends the initial installation of only 30,000 KW and deliv the power through two separate 115,00 volt transmission lines to the S Salvador load center for wholesale disposal to the various utility sys through their existing and proposed interconnections. According to th report, the power market is expected to absorb the entire output of th Guayabo installation, 182,000,000 kilowatt hours per annum, by the tim plant has been in operation five years.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

El Salvador

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Manufacturing (Industrial), Steel, Metal, Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project