RIO LEMPA HYDROELECT
Sector: Water Supply and Storage • Location: El Salvador
Source: World Bank Group
El Salvador is the smallest and most densely populated of the Cen American republics. Its industrial development has been seriously ret a shortage of electric power and the necessity for importing fuel. Po not a political question in El Salvador, as all factions seem to be un the purpose to develop the latent hydro-electric power of the Lempa Ri remove the impediment to national progress and secur
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Manufacturing (Industrial), Steel, Metal, Power Generation (CCGT), Hydro, Government
- Location
- El Salvador
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RIO LEMPA HYDROELECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | El Salvador is the smallest and most densely populated of the Cen American republics. Its industrial development has been seriously ret a shortage of electric power and the necessity for importing fuel. Po not a political question in El Salvador, as all factions seem to be un the purpose to develop the latent hydro-electric power of the Lempa Ri remove the impediment to national progress and security. A plan has b submitted by the Harza Engineering Company, of Chicago, for the ultima development of 75,000 kilowatts of generating capacity at the Chorrera Guayabo site and transmission of the power to all load centers of the The reservoir will provide 128,000 acre feet of effective storage. Th report recommends the initial installation of only 30,000 KW and deliv the power through two separate 115,00 volt transmission lines to the S Salvador load center for wholesale disposal to the various utility sys through their existing and proposed interconnections. According to th report, the power market is expected to absorb the entire output of th Guayabo installation, 182,000,000 kilowatt hours per annum, by the tim plant has been in operation five years. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | El Salvador |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Manufacturing (Industrial), Steel, Metal, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in El Salvador
- Molsa Grain Processing and Baking Facility
- BioEnergia S.A.
- American Industrial Park
- Tropical forest protection and water shed management in the Trifinio region
- Tropical Forest Protection und Water Shed Management in the Trifinio Region
- Automation of National Fish an Waterculture Register (CENDEPESCA)
- Financing for Access to Drinking Water and Sanitatio Systems (FIHIDROS)
- Support for the preparation and execution of the Flood Control Support Program in the Metropolitan Area of San Salvador (AMSS)
