logo

RIO MACHO HYDROELECT

Sector: Power Generation (CCGT) • Location: Costa Rica

Source: World Bank Group

Project
Closed

The Rio Macho Hydroelectric Project will provide power generation, as well as diesel generating capacity, and, although the initial capacity of the hydroelectric scheme will only be 30 MW, tunnels and other essential features will suffice for an ultimate capacity of 90 MW. The generating plant will consist of two 15 MW sets, with provisions for a plant expansion to a total of six 15 MW sets at a l

Project Information FAQ

Project Information

5 Q
The project “RIO MACHO HYDROELECT” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Costa Rica. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Rio Macho Hydroelectric Project will provide power generation, as well as diesel generating capacity, and, although the initial capacity of the hydroelectric scheme will only be 30 MW, tunnels and other essential features will suffice for an ultimate capacity of 90 MW. The generating plant will consist of two 15 MW sets, with provisions for a plant expansion to a total of six 15 MW sets at a later date. A tailrace (760 meters in length approximately) will carry the waters from the power plant to the Reventazon river. The project includes an outdoor step-up substation adjacent to the power plant, outdoor step-down substations at Colima, Barranca, and La Garita, with some 80 kilometers of 138 KV single circuit transmission line. Additionally, diesel generating plants, consisting of two 4 MW sets, will be installed at the Colima station, another two 0.5 MW at Limon station, on the East Coast.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data