RIO MACHO HYDROELECT
Closed · Costa Rica
Source: World Bank Group
The Rio Macho Hydroelectric Project will provide power generation, as well as diesel generating capacity, and, although the initial capacity of the hydroelectric scheme will only be 30 MW, tunnels and other essential features will suffice for an ultimate capacity of 90 MW. The generating plant will consist of two 15 MW sets, with provisions for a plant expansion to a total of six 15 MW sets at a l
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Hydro
- Location
- Costa Rica
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RIO MACHO HYDROELECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rio Macho Hydroelectric Project will provide power generation, as well as diesel generating capacity, and, although the initial capacity of the hydroelectric scheme will only be 30 MW, tunnels and other essential features will suffice for an ultimate capacity of 90 MW. The generating plant will consist of two 15 MW sets, with provisions for a plant expansion to a total of six 15 MW sets at a later date. A tailrace (760 meters in length approximately) will carry the waters from the power plant to the Reventazon river. The project includes an outdoor step-up substation adjacent to the power plant, outdoor step-down substations at Colima, Barranca, and La Garita, with some 80 kilometers of 138 KV single circuit transmission line. Additionally, diesel generating plants, consisting of two 4 MW sets, will be installed at the Colima station, another two 0.5 MW at Limon station, on the East Coast. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Costa Rica |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
