logo

Rio Pardo Thermal Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

Usina Rio Pardo S.A, a partnership of Brazilian companies Tavares de Almeida, Tejofran and Zogbi, was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Sao Paulo (60 MW in total capacity). The power plant was named UTE Rio Pardo.

The 30-year authorization contract was granted by the regulatory agency ANEEL to Usina Rio Pardo S.A. in Mar

Project Information FAQ

Project Information

5 Q
The project “Rio Pardo Thermal Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Usina Rio Pardo S.A, a partnership of Brazilian companies Tavares de Almeida, Tejofran and Zogbi, was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Sao Paulo (60 MW in total capacity). The power plant was named UTE Rio Pardo. The 30-year authorization contract was granted by the regulatory agency ANEEL to Usina Rio Pardo S.A. in March 2009. In March 2014, the authorization was transferred to the consortium Rio Pardo, a partnership of the Brazilian companies Usina Rio Pardo S.A. and Rio Pardo Termoeletrica Ltda. The amount invested in the power plant was not disclosed. Financial closure was achieved in February 2009 when the state-owned bank BNDES granted a US$ 70.8 million (BRL 141.7 million) loan to the construction of the sugar cane processing facility and the power plant. The construction works at UTE Rio Pardo commenced in April 2008, and operations began in September 2009. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. UTE Rio Pardo won the public bidding that took place in April 2015 by offering an average tariff of US$ XX/MWh (BRL 212.00/MWh). The project companies signed 20-year power purchase agreements with the several electricity distribution companies. In October 2015, Consortium Rio Pardo sold 100% of its shares in the project company to Albioma Rio Pardo Termoeletrica Ltda, a subsidiary of the French group Albioma.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data