Rio PCH 1 Small Hydro Plants

Sector: Automotive • Location: Brazil

Source: World Bank Group

Project
Active

In October 2007, the consortium RIO PCH I was granted the Installation Environmental License from federal regulator Aneel and immediately began constructing the Pedra do Garrafao and Pirapatenga Hydroelectric Plants on the Itabapoana river. The 25.14 MW Pedra do Garrafao plant was to be located between the municipalities of Bom Jesus de Itabapoana (Rio de Janeiro state) and Sao Jose do Calçado (E

Project Information FAQ

Project Information

5 Q
The project “Rio PCH 1 Small Hydro Plants” is an infrastructure initiative in the Automotive sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In October 2007, the consortium RIO PCH I was granted the Installation Environmental License from federal regulator Aneel and immediately began constructing the Pedra do Garrafao and Pirapatenga Hydroelectric Plants on the Itabapoana river. The 25.14 MW Pedra do Garrafao plant was to be located between the municipalities of Bom Jesus de Itabapoana (Rio de Janeiro state) and Sao Jose do Calçado (Espirito Santo state) and was to include 16 km of transmission lines connected to the Escelsa network. The 39 MW Pirapetinga plant was to be located between Campos dos Goytacazes (RJ) and Mimoso do Sul (ES) and was to include 6 km of transmission lines connected to the privately held Ampla network. RIO PCH I was a special purpose vehicle comprised of Neoenergia [Brazil, 75%] and Performance Centrais Hidreletricas Ltda (PCH) [Brazil, 25%]. Neoenergia, in turn was owned Previ [Brazil, 49.01%], Banco do Brasil [Brazil, 11.99%], and Iberdrola SA [Spain, 39%]. The project was independently developed by Performance Centrais Hidreletricas Ltda (PCH) after it obtained a license to act as an independent power producer in December 2002 from federal regulator Aneel. In June 2006, PCH sold its energy in an auction organized by Aneel to supply power starting in 2009 for 124.99 Real per Megawatt Hour. Neoenergia acquired its 75% stake in the project in May 2006 (Neonergia's shareholders are Iberdrola, 39%; Previ, 52.19%; and state-owned Banco do Brasil, 8.81%). Total investment for both projects was estimated at R$ 200 million (US $109.3 million). The project reached financial closure in October 2008 with a credit from the Brazilian development bank BNDES for approximately 70% of the project cost with a loan of R$ 121.2 million (US $66.2 million) for Rio PCH 1. The remainder of the project was to be financed through equity. The project became operational in June 2009. Project Became operational in June 2009 Investments converted from Real to USD using the period average, market rate for 2008 published by the IMF.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data