RIO TUMA HYDROELECTR
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Rio Tuma Hydroelectric Project will provide a loan to the Empresa Nacional de Luz y Fuerza, corporation wholly owned by the Government of Nicaragua. The Empresa has at present a total generating capacity of 38 MW and sells energy at retail in Managua and the surrounding area through its own distribution system. It also owns and operates the only transmisson system in Nicaragua and sells power
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- Nicaragua
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RIO TUMA HYDROELECTR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rio Tuma Hydroelectric Project will provide a loan to the Empresa Nacional de Luz y Fuerza, corporation wholly owned by the Government of Nicaragua. The Empresa has at present a total generating capacity of 38 MW and sells energy at retail in Managua and the surrounding area through its own distribution system. It also owns and operates the only transmisson system in Nicaragua and sells power on a wholesale basis to 14 municipal and private power companies in major urban centers of the country. A new power source will be necessary by mid-1965 to meet expected increases in power demand within the service area. The project consists of a rock fill dam on the Tuma River some 120 km north-east of Managua, and a power station providing additional 50 MW of generating capacity. The project is technically sound and adequate arrangements have been made for its execution. The new generating capacity to be provided by the Rio Tuma hydro plant is required to meet the increasing demand for power in the area served by Empresa. The cost of the project is reasonable. The present rates charged by Empresa for sale of power should be sufficient to yield reasonable earnings during the next few years. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Nicaragua |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Nicaragua
- WATER SUPPLY AND SANITATION PROGRAMME
- Puerto Cabezas
- Programme to improve the efficiency of the drinking water supply and the sewage treatment
- Program to improve the efficiency of the drinking water supply and the sewage treatment
- Improvement of the water supply in San Jacinto
- Nicaraguan Canal Project
- Nicaragua Canal Project
- Final Potable Water Designs and Sanitation in Intermediate Cities
