Riv Residential Building / Zanderroth Architekten
Sector: Cement • Location: Germany
Source: ArchDaily
The project “riv – Haus am Wasser” is a standalone structure adjacent to the Kornversuchsspeicher. The building benefits handsomely from the location’s advantages, thanks to its proximity to the water and its expansive views over the city. With all four sides designed to an equally high standard, the building’s light-flooded apartments are oriented in all directions.A grid of prefab-reinforced con
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project “riv – Haus am Wasser” is a standalone structure adjacent to the Kornversuchsspeicher. The building benefits handsomely from the location’s advantages, thanks to its proximity to the water and its expansive views over the city. With all four sides designed to an equally high standard, the building’s light-flooded apartments are oriented in all directions.A grid of prefab-reinforced concrete elements forms the building’s structure. The grid expresses itself in the living room areas through generous window elements and in the bedroom areas through closed plaster fields with a structured surface and simple tilt-and-turn windows.Text description provided by the architects.Europacity is a new quarter inBerlin’s Mitte district only a short distance from the Central Train Station, ringed by the Berlin-Spandau Ship Canal and Heidestrasse. The ensemble of buildings around the landmark-protected Kornversuchsspeicher, "Wasserstadt Mitte, " forms the northern section of the Europacity quarter.There are 3-room apartments oriented in two directions, 2-room apartments oriented toward one side, and 4-room apartments oriented in three directions. The ground-floor apartments feature a raised garden, while upper-floor apartments feature expansive balconies that enjoy usable depth thanks to the slight offsets of the facade.Circulation in the building occurs via two interior staircases each grouped around 4 apartments. The quarter’s central square leads via car elevator to an underground garage featuring 20 parking places for cars, 40 for bicycles, and various storage areas. Another 40 bicycle parking spots are located in the outdoor areas beside the building. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
