logo

River Bank Protection

Sector: Water Supply and Storage • Location: Bangladesh

Source: World Bank Group

Project
Closed

The River Bank Protection Project's principal objective is to prevent the erosion of riparian land at two locations on the west bank of the Brahmaputra by the construction and maintenance of improved river-bank protection works which will: 1) protect Sirajganj town's built-up and semi-urban areas from major damage and cumulative destruction; and 2) prevent the merger of the Brahmaputra and Bangali

Project Information FAQ

Project Information

5 Q
The project “River Bank Protection” is an infrastructure initiative in the Water Supply and Storage sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The River Bank Protection Project's principal objective is to prevent the erosion of riparian land at two locations on the west bank of the Brahmaputra by the construction and maintenance of improved river-bank protection works which will: 1) protect Sirajganj town's built-up and semi-urban areas from major damage and cumulative destruction; and 2) prevent the merger of the Brahmaputra and Bangali Rivers in the vicinity of Sariakandi and consequential increased regional flooding. A further objective is to assist the Government of Bangladesh (GOB) in developing permanent institutions for improved water sector planning, preserving the institutional capacity developed under the Flood Action Plan (FAP) and making multi-disciplinary planning part of Bangladesh's normal water sector planning processes. The project's components are: 1) rehabilitation and construction of river-bank protection works at two sites on the Brahmaputra River's west bank; 2) land acquisition and a program of resettlement for people displaced by project works; 3) technical assistance for implementation supervision and maintenance of works constructed under the project; 4) establishment and initial funding of a specialized operations and maintenance (O&M) Unit in the Bangladesh Water Development Board (BWDB) to maintain the riverbank protection works constructed under the project, and procurement of vehicles and equipment for the O&M Unit; 5) institution building technical assistance to Water Resources Planning Organization (WARPO) to integrate the FAP within the framework of national water planning, produce a national water management plan and a portfolio of investment projects for the medium and long-term, and upgrade integrated water sector planning capability; and 6) institutional capacity building technical assistance to BWDB to improve the operation of the new regional accounting centers, and provision of equipment and transport to improve project supervision capability in the field and internal communications.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data