River Bank Stabilization Projects
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
River bank erosion is evident along portions of the Merrimack and Contoocook Rivers within the City. In some areas this is impacting the structural integrity of some of our roads and parks. Coordination with the Sate and Federal Regulatory Agencies is required to initiate the river bank restoration to protect our roads and public lands. The City of Concord may be seeking a consultant to provide En
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Car parking, Automotive, Commercial, Government
- Location
- Concord, New Hampshire, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about River Bank Stabilization Projects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | River bank erosion is evident along portions of the Merrimack and Contoocook Rivers within the City. In some areas this is impacting the structural integrity of some of our roads and parks. Coordination with the Sate and Federal Regulatory Agencies is required to initiate the river bank restoration to protect our roads and public lands. The City of Concord may be seeking a consultant to provide Engineering Services for River bank erosion is evident along portions of the Merrimack and Contooco... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Concord |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Car parking, Automotive, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
