logo

RIVER LEVEE TRAIL EXT FM RVR LEVEE TRAIL TO 13TH ST-PH III D

Sector: Forest Products and Packaging • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

River Levee Trail Phase 3D will consist of an asphalt trail that will begin at the recently completed River Levee Trail Improvements (Phase 3C). The trail will continue southeast for approximately 1,200 feet to the Hawks Gully structure which will be improved for accessibility and safety. A timber boardwalk will then provide for access from the top of the Hawks Gully structure down to the base of

Project Information FAQ

Project Information

4 Q
The project “RIVER LEVEE TRAIL EXT FM RVR LEVEE TRAIL TO 13TH ST-PH III D” is an infrastructure initiative in the Forest Products and Packaging sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

River Levee Trail Phase 3D will consist of an asphalt trail that will begin at the recently completed River Levee Trail Improvements (Phase 3C). The trail will continue southeast for approximately 1,200 feet to the Hawks Gully structure which will be improved for accessibility and safety. A timber boardwalk will then provide for access from the top of the Hawks Gully structure down to the base of the levee at Water Edge Drive. After crossing Water's Edge Drive, the improved asphalt trail surface will continue southeast for another 2,100 feet until it reaches the existing sidewalk tie-in at 13th Street. Way-finding signage will route trail users south to the Reynolds Street Intersection to cross 13th Street safely and access the top of the levee. The total approximate project length is 3,816 linear feet.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data