River Oak Wastewater Improvements
Sector: Water Supply and Storage • Location: Seguin, Texas, United States of America
Source: Dodge USA
Principal items of construction will include installation of approximately 8,852 LF of 24-Inch, 18-Inch and 8-Inch PVC and HDPE sewer main by open cut and approximately 7,362 LF of 18-Inch HDPE Sewer main by pipe bursting. Approximately 710 LF of steel casing will be installed by bore and 176 LF of steel and PVC casing will be installed by open cut.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Steel, Government, Commercial, Metal
- Location
- Seguin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about River Oak Wastewater Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Principal items of construction will include installation of approximately 8,852 LF of 24-Inch, 18-Inch and 8-Inch PVC and HDPE sewer main by open cut and approximately 7,362 LF of 18-Inch HDPE Sewer main by pipe bursting. Approximately 710 LF of steel casing will be installed by bore and 176 LF of steel and PVC casing will be installed by open cut. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Seguin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Steel, Government, Commercial, Metal |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
