River Road Culvert Replacement
One of 9,133 projects Taiyo tracks in Maine.
Source: Dodge
consist of culvert replacing the culvert on River Road conveying an unnamed stream approximate 300 north of Ferry Road including, but not be limited to, the complete and satisfactory construction of the following: Remove existing twin 24 diameter CMP/HDPE culverts with a new 6 (rise) x 16 (span) x 73 (length) concrete box culvert and gabion basket walls and riprap embankments in accordance with th
- Status
- Closed
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Cement, Government
- Location
- Lewiston, Maine, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about River Road Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | consist of culvert replacing the culvert on River Road conveying an unnamed stream approximate 300 north of Ferry Road including, but not be limited to, the complete and satisfactory construction of the following: Remove existing twin 24 diameter CMP/HDPE culverts with a new 6 (rise) x 16 (span) x 73 (length) concrete box culvert and gabion basket walls and riprap embankments in accordance with the US Army Corps of Engineers permit (USACE) in Appendix B. Provide bypassing, dewatering, and ero... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maine |
City | Lewiston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
