logo
ProjectClosed

River Road Sewer Main Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The purpose of this Request for Proposal ( RFP ) is to select a CONTRACTOR to supply and install a new sewer main and associated works on River Road between 1st Street and the Sewage Treatment Plant. A new 250mm PVC sewer main will replace the 200mm VCT sewer main. The sewer main is approximately 4.2 m deep at 1st Street and River Road and approximately 1.2 m deep at the last manhole before the se

Status
Closed
Sector
Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage
Location
Lytton, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about River Road Sewer Main Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “River Road Sewer Main Replacement” is an infrastructure initiative in the Government sector, located in Lytton, British Columbia, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose of this Request for Proposal ( RFP ) is to select a CONTRACTOR to supply and install a new sewer main and associated works on River Road between 1st Street and the Sewage Treatment Plant. A new 250mm PVC sewer main will replace the 200mm VCT sewer main. The sewer main is approximately 4.2 m deep at 1st Street and River Road and approximately 1.2 m deep at the last manhole before the sewage treat plant. The 200mm VCT sewer main will remain active during installation of the new sewe...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Lytton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project