River Road Water Main Extensions
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
In general, the work consists of a base bid with the following combined work: River Road and 126th Street Water Main Extension The installation of approximately 860 linear feet of 12-inch HDPE by horizontal directional drill installation; 245 linear feet of 12-inch ductile iron water main by open cut installation; along with related fittings, valves, hydrants, pavement repair, sidewalk repair, app
- Status
- Prospective
- Sector
- Metal, Car parking, Road, Government, Water Supply and Storage, Steel, Automotive, Commercial
- Location
- Carmel, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about River Road Water Main Extensions
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work consists of a base bid with the following combined work: River Road and 126th Street Water Main Extension The installation of approximately 860 linear feet of 12-inch HDPE by horizontal directional drill installation; 245 linear feet of 12-inch ductile iron water main by open cut installation; along with related fittings, valves, hydrants, pavement repair, sidewalk repair, appurtenances, and other incidental work necessary for a complete installation. All Work needs to be... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Carmel |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Car parking, Road, Government, Water Supply and Storage, Steel, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
