River St Extension WRBP Pump Station & WWTF Compound Paving
Sector: Water Supply and Storage • Location: Franklin, New Hampshire, United States of America
Source: Dodge
Paving River Street Extension the WRBP River Street Pump Station and Wastewater Treatment Facility Compound. including the top parking area, and the entire WWTF compound (inside the fence line) at the WRBP Franklin WWTF. Paving shall be performed when weather permits after contract approval but shall be completed before June 30, 2025.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Raw Materials, Commercial, Car parking, Automotive
- Location
- Franklin, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about River St Extension WRBP Pump Station & WWTF Compound Paving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Paving River Street Extension the WRBP River Street Pump Station and Wastewater Treatment Facility Compound. including the top parking area, and the entire WWTF compound (inside the fence line) at the WRBP Franklin WWTF. Paving shall be performed when weather permits after contract approval but shall be completed before June 30, 2025. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Franklin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Raw Materials, Commercial, Car parking, Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
