logo

River Supply Conduit Improvement Upper Reach – Unit 7

Sector: Power Generation (CCGT) • Location: Burbank, California, United States of America

Source: Los Angles Department of Water and Power (LADWP)

Project
Closed

The River Supply Conduit (RSC) Improvement Upper Reach Unit 7 Project consists of installing 13,325 linear-feet of 78-inch diameter welded steel pipeline primarily within a tunnel. The project is located in the Burbank area. The tunnel begins at Johnny Carson Park South, located south of the 134 Freeway in Burbank and continues northwest under Whitnall Highway to join RSC Unit 6 near Biloxi Avenue

Project Information FAQ

Project Information

4 Q
The project “River Supply Conduit Improvement Upper Reach – Unit 7” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Burbank, California, United States of America. Taiyo aggregates data on it from Los Angles Department of Water and Power (LADWP).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The River Supply Conduit (RSC) Improvement Upper Reach Unit 7 Project consists of installing 13,325 linear-feet of 78-inch diameter welded steel pipeline primarily within a tunnel. The project is located in the Burbank area. The tunnel begins at Johnny Carson Park South, located south of the 134 Freeway in Burbank and continues northwest under Whitnall Highway to join RSC Unit 6 near Biloxi Avenue and West Burbank Boulevard. Micro-tunneling will be used for a short section starting at Forest Lawn Drive under the L.A. River and will join with the tunnel at Johnny Carson Park South. A short open trench section will connect RSC Unit 7 with RSC Unit 6. Another open trench section will connect RSC Unit 7 with a pipeline at the Headworks Reservoir Facility.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data