RIVER TRANSPORT I
Sector: Mass Transit • Location: Congo, Democratic Republic of
Source: World Bank Group
The River Transport Project, be carried out over a two-year period, includes (a) the rehabilitation of navigational aids and dredging facilities and equipment in the Congo River estuary; (b) the improvement of navigation on the Kinshasa-Port-Francqui waterway; (c) the rehabilitation of OTRACO's river fleet; (d) the provision of experts to fill key positions in OTRACO and the two Regies; and (e) th
- Status
- Closed
- Sector
- Mass Transit, Road, Water Supply and Storage, Rail, Seaport, Government
- Location
- Democratic Republic of the Congo
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about RIVER TRANSPORT I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The River Transport Project, be carried out over a two-year period, includes (a) the rehabilitation of navigational aids and dredging facilities and equipment in the Congo River estuary; (b) the improvement of navigation on the Kinshasa-Port-Francqui waterway; (c) the rehabilitation of OTRACO's river fleet; (d) the provision of experts to fill key positions in OTRACO and the two Regies; and (e) the study of the Voie Nationale. |
Original sector | Transportation |
Location
Country | Democratic Republic of the Congo (DRC) |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Water Supply and Storage, Rail, Seaport, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
