River Trunk Realignment and Pump Station
Sector: Road • Location: United States of America (USA)
Source: ENR news
Realigning the existing River Trunk, moving it away from its current location, adjacent to the Tuolumne River, and into the public right-of-way. As part of the realignment project, a large pump station is required to receive gravity flows and convey flows through pressurized force mains under Highway 99 to a new gravity system along Tuolumne Boulevard and Colorado Avenue.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | open for bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Realigning the existing River Trunk, moving it away from its current location, adjacent to the Tuolumne River, and into the public right-of-way. As part of the realignment project, a large pump station is required to receive gravity flows and convey flows through pressurized force mains under Highway 99 to a new gravity system along Tuolumne Boulevard and Colorado Avenue. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
