logo
ProjectBidding

Riverdale Trail Connection

Sector: Cement • Location: Thornton, Colorado, United States of America

Source: Dodge USA

This project includes replacement of approximately 1150 feet of existing gravel trail in the Pelican Ponds Open Space with 6-inch thick concrete sidewalk along the eastern side of Riverdale Road, connecting the existing junction of the Colorado Front Range Trail to an existing pedestrian crossing at Bellaire Street. Project also includes an option to replace two American with Disabilities Act (ADA

Status
Prospective
Sector
Cement, Road, Car parking, Mass Transit, Automotive, Rail, Government, Commercial
Location
Thornton, Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Riverdale Trail Connection

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Riverdale Trail Connection” is an infrastructure initiative in the Cement sector, located in Thornton, Colorado, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project includes replacement of approximately 1150 feet of existing gravel trail in the Pelican Ponds Open Space with 6-inch thick concrete sidewalk along the eastern side of Riverdale Road, connecting the existing junction of the Colorado Front Range Trail to an existing pedestrian crossing at Bellaire Street. Project also includes an option to replace two American with Disabilities Act (ADA) ramps, and the adjacent curb, gutter and sidewalk at the intersection of Clermont Drive and Bel...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Thornton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Road, Car parking, Mass Transit, Automotive, Rail, Government, Commercial

Article published date

2024-07-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project