Riverfront East Mixed Use Development PPP Master Report
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
86-acre mixed-use project expected to eventually include 1.9 million sq. ft. of office space, 4.7 million sq. ft. of residential space - Develop parks and infrastructure, road construction- - 8,900 planned structured parking spaces are distributed throughout the development site - 650 car street level parking - 13 acres of open space - Once the Salvation Army complex is complete by Fall 2022 Phase
- Status
- Prospective
- Sector
- Consumer Products, Road, Car parking, Automotive, Commercial, Manufacturing (Industrial), Residential
- Location
- Wilmington, Delaware, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Riverfront East Mixed Use Development PPP Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 86-acre mixed-use project expected to eventually include 1.9 million sq. ft. of office space, 4.7 million sq. ft. of residential space - Develop parks and infrastructure, road construction- - 8,900 planned structured parking spaces are distributed throughout the development site - 650 car street level parking - 13 acres of open space - Once the Salvation Army complex is complete by Fall 2022 Phase 1 will advance over 16 months with road construction, including the creation of a South Orange S... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Delaware |
City | Wilmington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Road, Car parking, Automotive, Commercial, Manufacturing (Industrial), Residential |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
