Riverfront Marina Walkway Repairs
Sector: Car parking • Location: Wilmington, North Carolina, United States of America
Source: Dodge USA
The repair includes using a polyurethane grout injection into the poor support soils under the existing concrete slab on grade Riverwalk. This will likely require additional visits over time to continue compacting the poor soils and filling voids due to the extended depth the voids occur. We also have included demolishing the Riverwalk within the project site and installing new concrete, since we
- Status
- Closed
- Sector
- Car parking, Seaport, Cement, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Wilmington, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Riverfront Marina Walkway Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The repair includes using a polyurethane grout injection into the poor support soils under the existing concrete slab on grade Riverwalk. This will likely require additional visits over time to continue compacting the poor soils and filling voids due to the extended depth the voids occur. We also have included demolishing the Riverwalk within the project site and installing new concrete, since we anticipate the existing Riverwalk concrete being damaged during repair implementation. In respons... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Wilmington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Seaport, Cement, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
