logo
ProjectPre-Design

Riverfront Trail Improvements Phase 1

One of 10,000+ projects Taiyo tracks in Connecticut.

Source: Dodge

Construction of a trail that will be part of a system to connect with the Charter Oak Greenway crossing the Connecticut River, and with the recently constructed trail from East Barber Street to Meadow Road. The proposed trail will be approximately 14,000 feet in length and be construction of bituminous concrete 10 feet width. It will traverse property owned by the Town of Windsor, the State of Con

Status
Prospective
Sector
Cement, Mass Transit, Road, Commercial, Car parking, Automotive, Government, Rail
Location
Windsor, Connecticut, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Riverfront Trail Improvements Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Riverfront Trail Improvements Phase 1” is an infrastructure initiative in the Cement sector, located in Windsor, Connecticut, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Construction of a trail that will be part of a system to connect with the Charter Oak Greenway crossing the Connecticut River, and with the recently constructed trail from East Barber Street to Meadow Road. The proposed trail will be approximately 14,000 feet in length and be construction of bituminous concrete 10 feet width. It will traverse property owned by the Town of Windsor, the State of Connecticut, the Loomis Chaffee School and Three private owners.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Connecticut

City

Windsor

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Mass Transit, Road, Commercial, Car parking, Automotive, Government, Rail

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project