Riverside Avenue Water Main Replacement
Sector: Water Supply and Storage • Location: Grants Pass, Oregon, United States of America
Source: Dodge USA
. THE PROPOSED WORK INCLUDES APPROXIMATELY THE FOLLOWING: THIS PROJECT WILL CONSIST OF INSTALLING AND REPLACING 325 LF OF 8 WATER PIPE AND FITTINGS, COMPLETE 6 RE-PLUMBING TO HOUSES AND 6 POTABLE WATER SERVICE CONNECTIONS, 2 AND SMALLER; RELOCATING 2 PRIVATE VALVES TO BEHIND THE RIGHT OF WAY, 1,623 SF OF CONCRETE SIDEWALK, 350 SF OF CONCRETE SIDEWALK RAMPS WITH TRUNCATED DOMES, 898 SF OF CONCRETE
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | . THE PROPOSED WORK INCLUDES APPROXIMATELY THE FOLLOWING: THIS PROJECT WILL CONSIST OF INSTALLING AND REPLACING 325 LF OF 8 WATER PIPE AND FITTINGS, COMPLETE 6 RE-PLUMBING TO HOUSES AND 6 POTABLE WATER SERVICE CONNECTIONS, 2 AND SMALLER; RELOCATING 2 PRIVATE VALVES TO BEHIND THE RIGHT OF WAY, 1,623 SF OF CONCRETE SIDEWALK, 350 SF OF CONCRETE SIDEWALK RAMPS WITH TRUNCATED DOMES, 898 SF OF CONCRETE PAVEMENT DRIVEWAY APRONS AND TRANSITIONS, PNEUMATIC SOIL EXCAVATION, AND ASPHALT PATCHING AND PAV... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
