Riverside Downtown Facade Revitalization
Closed · Iowa · Last reported Sep 2024
Source: Dodge USA
The proposed project consists of renovation to 7 existing Downtown Riverside storefront buildings as listed below, described in the construction documents, and generally includes selective demolition, door, window, and wall repair and replacement, painting, masonry renovation such as brick replacement, repointing, repair, and work associated with these items.
- Status
- Closed
- Sector
- Commercial, Government, Cement, Manufacturing (Industrial)
- Location
- Riverside, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Riverside Downtown Facade Revitalization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of renovation to 7 existing Downtown Riverside storefront buildings as listed below, described in the construction documents, and generally includes selective demolition, door, window, and wall repair and replacement, painting, masonry renovation such as brick replacement, repointing, repair, and work associated with these items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Riverside |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Cement, Manufacturing (Industrial) |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
