logo
ProjectClosed

Riverside Drive West Shared Use Path

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Construction of approximately 950 feet of eight-foot asphalt shared use path and a 130-foot steel pedestrian bridge on the west side of Riverside Drive between Emerald Parkway and the Dublin Arts Council.

Status
Closed
Sector
Commercial, Bridge, Road, Government, Steel, Metal
Location
Dublin, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Riverside Drive West Shared Use Path

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Riverside Drive West Shared Use Path” is an infrastructure initiative in the Commercial sector, located in Dublin, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of approximately 950 feet of eight-foot asphalt shared use path and a 130-foot steel pedestrian bridge on the west side of Riverside Drive between Emerald Parkway and the Dublin Arts Council.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Dublin

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Bridge, Road, Government, Steel, Metal

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project